This job is priced by the square footage of wet area you create and the amount of glass in front of it. Most other choices follow.
Read it for the parts you never see again once tile goes on: the pan and how it is sloped, the waterproofing system named by product, whether a flood test happens before tile, a wet-rated wall board rather than drywall, tile square footage and pattern, the valve and its number of outlets, and blocking for glass, bench and grab bars.
Three things sit outside the first number. Glass is often a separate contract, quoted after the shower is built. Sealing natural stone is ongoing work. And the exhaust fan: a bigger shower makes more steam than the old fan was sized for, and upsizing it is electrical work nobody mentions until the mirror fogs.
Three to seven days on site for a standard footprint, per the scope on the bathroom remodel cost guide, longer if plumbing moves. Much of that is waiting, not working: waterproofing cures, the flood test holds water overnight, mortar sets, grout goes on the next day and cures before sealing. A crew compressing those days is not being efficient. Glass cannot be measured until tile is finished, so the shower is usually usable behind a curtain before the doors arrive.
If a tub is what is in the way, start from tub-to-shower conversion cost. That scope reuses the tub's footprint and often its drain, so it is priced as a swap rather than a build. Layout and tile direction live in walk-in shower ideas.
More often a good project in the wrong house than a bad project.
West Shore Home installs with its own employees rather than subcontracting the work out (something the company states plainly and few competitors will) and the reviews back that up with real specifics: homeowners across its network consistently name the two- or three-person crew that did their work, right down to first names. What recurs alongside that is care for the rest of the house: floors and furniture protected, the site swept clean before the crew leaves. Most bath jobs finish in a single day, and even larger combined projects (a full shower-to-floor-to-vanity remodel, a house of a dozen-plus windows) are routinely wrapped up in one to two days. Homeowners who added windows report a noticeable difference in how much cooler the house feels afterward. The in-home estimate is detailed and covers every material and installation option, so allow a good couple of hours for it.
Bath Fitter pioneered the one-day acrylic model in 1984, fitting a new tub or shower wall directly over your existing one rather than tearing it out. Reviewers across the network consistently credit their individual installer by name for careful, clean work, and many describe installers thoughtfully accommodating specific needs, whether seat height, grab-bar placement or a lower threshold, for aging-in-place remodels. The acrylic itself carries a lifetime warranty against manufacturing defects with no date limit; the June 2023 date some homeowners see governs only whether that warranty transfers to a new owner, and doors, faucets, and other plumbing fixtures fall under their own separate terms. Because the new surface is sealed directly over the old one rather than replacing it, ask your installer to walk you through how the seams at the drain and walls are finished and inspected, a detail worth understanding for a job built this way.
Zintex Remodeling Group is a family-owned bath specialist working across the South and lower Midwest, and it has won a BBB Torch Award for ethics. Reviewers consistently name their installer and their project coordinator, describing baths finished in the one to two days promised with floors and furniture protected along the way, and a follow-up visit scheduled quickly if anything needs adjusting afterward. A good share of the work is accessibility conversions (low-threshold showers, grab bars, walk-in tubs) done for a parent or a family member with limited mobility. Its warranty is unusually specific for this category: Jacuzzi covers the product for as long as you own the home, Zintex covers its own labor for the same term, and the whole thing transfers if you sell within two years. One thing to know before booking: Zintex asks that all decision-makers attend the in-home appointment.
ImproveIt! Home Remodeling has worked across Ohio, Kentucky, Tennessee and now North Carolina for more than thirty years, covering windows, bath, and kitchen cabinet refacing. Installers draw the most specific praise in their reviews: homeowners name the crew, describe furniture and floors protected through the job, and point to details like a flashing piece custom-bent to fit rather than left standard. The design consultant is the other steady theme: patient, unhurried, and praised for measuring every opening rather than estimating. Warranty follow-through shows up too, with homeowners describing periodic courtesy calls and, in one case, service honored on windows installed more than thirty years earlier. Their in-home appointment is genuinely thorough and can run well past the hour or so you will be quoted, so allow real time for that first visit.
American Home Design has served Nashville and Middle Tennessee since 1977, covering windows, bath and outdoor living, and it is the region’s Jacuzzi Bath Remodel partner. Reviewers name their installers with unusual consistency, and even homeowners frustrated with a separate part of the process still go out of their way to praise the crew that did the work. The recurring detail is care for the rest of the house: floors and fixtures covered, nothing left behind, and most installs landing in the one to two days promised. They publish their own per-window pricing, which is rarer than it should be. If a warranty issue comes up after the install, ask up front how follow-up visits are scheduled.
Bath Experts is the Jacuzzi Bath Remodel dealer for Indiana, Ohio and Kentucky, and in Indianapolis and Cincinnati it also refaces kitchen cabinets under its sister brand. Reviews are consistently strong on one-day installs and on the finished product, and the praise attaches to named installers. Several homeowners who were unhappy with something else still singled out the crew that did the work. Installers are also credited for fitting accessibility features, like grab bars, to the person who will actually use them rather than a standard layout. The company says its installation teams are its own employees rather than subcontractors, and its warranty covers both the products and the workmanship. Ask for a walkthrough of trim and hardware fit before the crew leaves, and for a direct contact for anything that comes up afterward.
A prefab enclosure in a stock size is usually at the low end of a price range; a large curbless tiled shower with frameless glass and several outlets is at the high end. Footprint and glass move it more than tile selection does.
Yes, when the tub in that bathroom goes unused and bathing is covered elsewhere: daily use improves, cleaning gets easier with no tub rim, and a curbless build removes a step that gets harder with age. In a one-bathroom home a combo is still the better buy.
No, and doorless is a design rather than a shortcut. It relies on length and a fixed splash panel to keep water in. The trade-offs are steam escaping and a cooler shower in winter, and the extra floor area needed can cancel out the saved hardware.
The shower is not the issue; losing the home's last bathtub is what narrows the buyer pool. With another tub in the house, a well-built walk-in in the primary bath is generally an asset.
They quote this as a job, not an hourly rate, because labor content depends on the build: normally the larger half of a tiled shower, much less on a prefab enclosure. Ask for materials and labor split out. Two bids agreeing on the total but not the split describe two different projects.