# How Much Does a Tub-to-Shower Conversion Cost? | RYH

> How Much Does a Tub-to-Shower Conversion Cost? Estimated cost $4,200-$14,300, what drives the price, and what a fair quote includes.



**$4,200-$14,300***: to take out the tub and put a walk-in shower in its place, with the surround you pick and whether the drain has to move accounting for most of the spread

*All cost estimates on this page are planning estimates, not quotes. Actual costs vary by location, project scope, materials, site conditions, and contractor. [See methodology and sources.](/how-we-calculate-costs/index.md)

## What Moves a Tub-to-Shower Quote

Two decisions set the price. The surround: a one-piece acrylic or fiberglass system is cheapest and fastest, tile the most expensive. Then the drain. If the new base sits over the old tub drain, a plumber connects it and moves on. If not, someone opens the floor: straightforward from a crawlspace, expensive through a slab.

- **Footprint.** Staying inside the tub's outline keeps this a wet-area job. Borrowing a foot from a closet adds framing and drywall.
- **Glass.** A curtain rod costs almost nothing. Frameless is the easiest place here to overspend.
- **What is behind the tub.** Soft subfloor at the drain shows up only after demo, and it is the usual change order.
- **Grab bars, bench, niche.** Each needs blocking set before the surround goes on. Cheap now, a rebuild later.

## What the Quote Should Cover

Look for tub removal and haul-away, a base pitched to the drain, the waterproofing behind the surround named by product, the valve and trim, the door or curtain rod with glass thickness stated, and walls patched back to a paintable edge.

Usually outside the first number: drain relocation, subfloor repair, permit fees, paint, and anything touching the vanity, fan or lighting. An **allowance** for tile or glass is a placeholder, not a price. Ask what it buys. And a reused shower valve is one someone may have to reach through finished tile for later.

## How Long a Conversion Takes

One to three days on site for an acrylic or fiberglass system, per the scope on the [bathroom remodel cost guide](/bathroom-remodel-cost/index.md). Tile runs longer, because mortar and grout cure on separate days.

The wait is the parts. The base is ordered to your opening, and glass cannot be ordered until the base is in and the real opening is measured, which is why a frameless door often arrives after the shower is otherwise done. Confirm materials have landed before agreeing a start date.

## Conversion, Refinish, or Full Remodel?

- **Refinishing or relining the tub** is far cheaper and quicker, but does not lower the step-in by an inch: wrong answer if the rim is the problem. See [refinishing versus replacement](/articles/bathtub-refinishing-vs-replacement/index.md).
- **This conversion** replaces the tub, surround and door, and leaves the vanity, toilet, floor and lighting alone.
- **A full bath remodel** is priced far above this range on the [bathroom cost guide](/bathroom-remodel-cost/index.md), because it takes the room down and puts it back.

If you want a bigger shower rather than the tub gone, price it as its own build on our [walk-in shower cost](/walk-in-shower-cost/index.md) page.

## When a Conversion Is the Wrong Buy

- **It is the only tub in the house.** A household and resale decision before a cost one: our [conversion guide](/articles/tub-to-shower-conversion/index.md) works through it.
- **The bathroom is being remodeled soon.** This demolishes the wet area, so you would pay for the same demo twice.
- **The tub is sound and only the surround looks tired.** Caulk, grout and a new door cost a fraction and recover most of the look.
- **Mobility is the reason and the budget is tight.** Spend on a zero-threshold base and blocking for grab bars, not glass. A framed door on a curbless base beats frameless glass you still have to step over.

## Surround and Base Options

- **One-piece acrylic or fiberglass.** Fewest seams, fastest, cheapest, least design range. Needs a clear path in, so it will not always fit through a finished doorway.
- **Multi-piece solid surface.** Seams on site, so it reaches rooms a one-piece cannot, in more colors. Costs more, installs nearly as fast.
- **Tile over a pan.** Any pattern and niche you want, longest schedule, highest cost. Its durability lives in the waterproofing underneath, not the tile.
- **Low curb versus curbless.** A curb asks nothing of the floor; curbless usually means recessing the subfloor, and it is the option that actually delivers the accessibility people buy this for.

## Bathroom Remodeling Companies, Ranked by Real Customer Rating

West Shore Home

★★★★★ 4.8 Google · pooled across 35 US locations (47,085 reviews) as of August 2026

One-day bath systems in 20+ states. Custom acrylic panels with safety upgrade options.

![Remy](/images/remy/face-6aa3719e.png) Remy's Take

West Shore Home installs with its own employees rather than subcontracting the work out (something the company states plainly and few competitors will) and the reviews back that up with real specifics: homeowners across its network consistently name the two- or three-person crew that did their work, right down to first names. What recurs alongside that is care for the rest of the house: floors and furniture protected, the site swept clean before the crew leaves. Most bath jobs finish in a single day, and even larger combined projects (a full shower-to-floor-to-vanity remodel, a house of a dozen-plus windows) are routinely wrapped up in one to two days. Homeowners who added windows report a noticeable difference in how much cooler the house feels afterward. The in-home estimate is detailed and covers every material and installation option, so allow a good couple of hours for it.

[Learn More About West Shore Home →](/west-shore-home-bath-review/index.md)

Bath Fitter

★★★★★ 4.8 Google · pooled across 80 US locations (25,980 reviews) as of August 2026

Original one-day liner specialist since 1984. Welded seams eliminate liner failure points.

![Remy](/images/remy/face-6aa3719e.png) Remy's Take

Bath Fitter pioneered the one-day acrylic model in 1984, fitting a new tub or shower wall directly over your existing one rather than tearing it out. Reviewers across the network consistently credit their individual installer by name for careful, clean work, and many describe installers thoughtfully accommodating specific needs, whether seat height, grab-bar placement or a lower threshold, for aging-in-place remodels. The acrylic itself carries a lifetime warranty against manufacturing defects with no date limit; the June 2023 date some homeowners see governs only whether that warranty transfers to a new owner, and doors, faucets, and other plumbing fixtures fall under their own separate terms. Because the new surface is sealed directly over the old one rather than replacing it, ask your installer to walk you through how the seams at the drain and walls are finished and inspected, a detail worth understanding for a job built this way.

[Learn More About Bath Fitter →](/bath-fitter-review/index.md)

Zintex Remodeling Group

★★★★★ 4.9 Google · pooled across 16 US locations (4,138 reviews) as of August 2026

Top-rated bath specialist in Texas. One-day installations in DFW, Houston, San Antonio, Austin.

![Remy](/images/remy/face-6aa3719e.png) Remy's Take

Zintex Remodeling Group is a family-owned bath specialist working across the South and lower Midwest, and it has won a BBB Torch Award for ethics. Reviewers consistently name their installer and their project coordinator, describing baths finished in the one to two days promised with floors and furniture protected along the way, and a follow-up visit scheduled quickly if anything needs adjusting afterward. A good share of the work is accessibility conversions (low-threshold showers, grab bars, walk-in tubs) done for a parent or a family member with limited mobility. Its warranty is unusually specific for this category: Jacuzzi covers the product for as long as you own the home, Zintex covers its own labor for the same term, and the whole thing transfers if you sell within two years. One thing to know before booking: Zintex asks that all decision-makers attend the in-home appointment.

[Learn More About Zintex Remodeling Group →](/zintex-remodeling-review/index.md)

ImproveIt! Home Remodeling

★★★★★ 4.8 Google · pooled across 5 US locations (3,941 reviews) as of August 2026

30+ years in OH, KY, TN. W-2 installers for bath and windows, one-day installs.

![Remy](/images/remy/face-6aa3719e.png) Remy's Take

ImproveIt! Home Remodeling has worked across Ohio, Kentucky, Tennessee and now North Carolina for more than thirty years, covering windows, bath, and kitchen cabinet refacing. Installers draw the most specific praise in their reviews: homeowners name the crew, describe furniture and floors protected through the job, and point to details like a flashing piece custom-bent to fit rather than left standard. The design consultant is the other steady theme: patient, unhurried, and praised for measuring every opening rather than estimating. Warranty follow-through shows up too, with homeowners describing periodic courtesy calls and, in one case, service honored on windows installed more than thirty years earlier. Their in-home appointment is genuinely thorough and can run well past the hour or so you will be quoted, so allow real time for that first visit.

[Learn More About ImproveIt! Home Remodeling →](/improveit-home-remodeling-review/index.md)

American Home Design

★★★★★ 4.8 [Google · flagship location (2,136 reviews)](https://www.google.com/maps/place/American+Home+Design/@36.3207606,-86.7024725,740m/data=!3m2!1e3!4b1!4m6!3m5!1s0x8864448a1e4e9887:0x87539f3109c79980!8m2!3d36.3207606!4d-86.7024725!16s%2Fg%2F1tdn07f2) as of August 2026

Windows + bath in one company. Lifetime warranty.

![Remy](/images/remy/face-6aa3719e.png) Remy's Take

American Home Design has served Nashville and Middle Tennessee since 1977, covering windows, bath and outdoor living, and it is the region’s Jacuzzi Bath Remodel partner. Reviewers name their installers with unusual consistency, and even homeowners frustrated with a separate part of the process still go out of their way to praise the crew that did the work. The recurring detail is care for the rest of the house: floors and fixtures covered, nothing left behind, and most installs landing in the one to two days promised. They publish their own per-window pricing, which is rarer than it should be. If a warranty issue comes up after the install, ask up front how follow-up visits are scheduled.

[Learn More About American Home Design →](/american-home-design-review/index.md)

Bath Experts

★★★★★ 4.8 Google · pooled across 5 US locations (2,058 reviews) as of August 2026

Exclusive Jacuzzi dealer in IN, OH, KY. Full-service bath remodeling, regional 4.8-star rating.

![Remy](/images/remy/face-6aa3719e.png) Remy's Take

Bath Experts is the Jacuzzi Bath Remodel dealer for Indiana, Ohio and Kentucky, and in Indianapolis and Cincinnati it also refaces kitchen cabinets under its sister brand. Reviews are consistently strong on one-day installs and on the finished product, and the praise attaches to named installers. Several homeowners who were unhappy with something else still singled out the crew that did the work. Installers are also credited for fitting accessibility features, like grab bars, to the person who will actually use them rather than a standard layout. The company says its installation teams are its own employees rather than subcontractors, and its warranty covers both the products and the workmanship. Ask for a walkthrough of trim and hardware fit before the crew leaves, and for a direct contact for anything that comes up afterward.

[Learn More About Bath Experts →](/bath-experts-review/index.md)

## Frequently Asked Questions

### How much does a tub to shower conversion cost?

A one-piece acrylic system in the old tub footprint over the existing drain sits near the bottom of the range above. A tiled shower with frameless glass and a relocated drain in a slab home sits near the top.

### Is it worth it to convert a tub to a shower?

Worth it when you have stopped using the tub or getting over the rim is difficult. A harder call if it is the only tub in the home: our [conversion guide](/articles/tub-to-shower-conversion/index.md) takes that on, including who should not do it.

### Does a tub to shower conversion increase home value?

It turns less on the shower than on what is left in the house. Converting a primary bath's tub when another tub remains is generally well received; removing the home's last tub narrows your buyer pool.

### How long does a tub-to-shower conversion take?

One to three days on site for acrylic or fiberglass, longer for tile. Ordering sets the calendar: the base is made to your opening, and glass can only be ordered once the base is set and measured.

### Do you need a permit for a tub to shower conversion?

Often, and it varies by jurisdiction. Swapping a fixture in place is treated differently from altering drain or vent lines, and moving the drain is the trigger in most places. Ask your contractor to name the permit and say whether the fee is inside the quote.

## Related Guides

[Bathroom Remodeling Cost & ROI Guide](/bathroom-remodel-cost/index.md)[Bathroom Remodeling Contractors](/bathroom-remodeling/index.md)[Read more on a Tub-to-Shower Conversion](/articles/tub-to-shower-conversion/index.md)

---
Source: https://remodelyourhome.com/tub-to-shower-conversion-cost/
